11MVA
Maximum under the current Entergy tariff
Amergy Solar’s Morrilton project is an AI data center development opportunity on Arkansas’s I-40 corridor. The industrial-zoned site is already served by an adjacent Entergy substation: 11 MVA under the current tariff, with stated expansion potential to 50 MVA.

The Morrilton site in six figures.
11MVA
Maximum under the current Entergy tariff
50MVA
Subject to utility confirmation and approvals
161 / 13.8kV
Adjacent Entergy substation
100Gbps
Fiber reported available; provisioning to be confirmed
8acres
Available for use; 1.5 acres currently occupied
I-40
About one hour northwest of Little Rock
A 13.8 kV circuit from the adjacent Entergy substation already serves the site. Expansion toward the stated 50 MVA is subject to utility review, required upgrades, and approvals.
Capacity figures are stated in MVA and do not represent a confirmed usable IT load.
Steps 161 kV down to 13.8 kV
In service today
Industrial-zoned parcel
Industrial zoning and direct I-40 access support site layout, equipment delivery, and future development.
Our energy background shapes how we approach AI infrastructure: start with the power connection and plan energy needs alongside the site.
Renewable energy and battery storage can be explored during planning, subject to feasibility, utility requirements, and operator needs.
More about AmergyWe welcome conversations with:
Evaluating sites for AI and high-density compute.
Planning compute around an existing power connection.
Focused on digital and energy infrastructure.
Supporting power planning and facility design.