AI Data CenterMorrilton, Arkansas

AI Infrastructure Starts With Power.

Amergy Solar’s Morrilton project is an AI data center development opportunity on Arkansas’s I-40 corridor. The industrial-zoned site is already served by an adjacent Entergy substation: 11 MVA under the current tariff, with stated expansion potential to 50 MVA.

Cutaway concept rendering of a modular AI data center: rows of server racks under overhead liquid-cooling piping on a raised steel platform
Morrilton area, ArkansasConcept rendering
02Project overview

Project at a Glance

The Morrilton site in six figures.

Current tariff

11MVA

Maximum under the current Entergy tariff

Stated potential

50MVA

Subject to utility confirmation and approvals

Substation

161 / 13.8kV

Adjacent Entergy substation

Connectivity

100Gbps

Fiber reported available; provisioning to be confirmed

Land · Industrial zoned

8acres

Available for use; 1.5 acres currently occupied

Access

I-40

About one hour northwest of Little Rock

03Power conditions

An Existing Power Connection

A 13.8 kV circuit from the adjacent Entergy substation already serves the site. Expansion toward the stated 50 MVA is subject to utility review, required upgrades, and approvals.

Capacity figures are stated in MVA and do not represent a confirmed usable IT load.

  1. Utility

    Entergy substation

    Steps 161 kV down to 13.8 kV

  2. Service

    One 13.8 kV circuit

    In service today

  3. Site

    Morrilton site

    Industrial-zoned parcel

04Site and location

Industrial Land. Regional Access. Fiber Availability.

Industrial zoning and direct I-40 access support site layout, equipment delivery, and future development.

05Amergy capabilities

Energy Experience for AI Infrastructure

Our energy background shapes how we approach AI infrastructure: start with the power connection and plan energy needs alongside the site.

  1. 01Solar & battery storage development
  2. 02Financing
  3. 03EPC management
  4. 04Asset ownership
  5. 05Operations

Renewable energy and battery storage can be explored during planning, subject to feasibility, utility requirements, and operator needs.

More about Amergy
06Partnership inquiries

Explore a Development Partnership

We welcome conversations with:

  • Data center developers & operators

    Evaluating sites for AI and high-density compute.

  • AI & cloud infrastructure companies

    Planning compute around an existing power connection.

  • Infrastructure investors

    Focused on digital and energy infrastructure.

  • Energy & engineering partners

    Supporting power planning and facility design.